Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Afshar, A, Ziaraty, A K, Kaveh, A and Sharifi, F (2009) Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization. Journal of Construction Engineering and Management, 135(07), 668–74.

  • Type: Journal Article
  • Keywords: Optimization; Construction management; Decision making;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:7(668)
  • Abstract:
    Time–cost trade-off analysis is addressed as an important aspect of any construction project planning and control. Nonexistence of a unique solution makes the time–cost trade-off problems very difficult to tackle. As a combinatorial optimization problem one may apply heuristics or mathematical programming techniques to solve time–cost trade-off problems. In this paper, a new multicolony ant algorithm is developed and used to solve the time–cost multiobjective optimization problem. Pareto archiving together with innovative solution exchange strategy are introduced which are highly efficient in developing the Pareto front and set of nondominated solutions in a time–cost optimization problem. An 18-activity time–cost problem is used to evaluate the performance of the proposed algorithm. Results show that the proposed algorithm outperforms the well-known weighted method to develop the nondominated solutions in a combinatorial optimization problem. The paper is more relevant to researchers who are interested in developing new quantitative methods and/or algorithms for managing construction projects.

Cha, H S, Kim, J and Han, J (2009) Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. Journal of Construction Engineering and Management, 135(07), 647–56.

Cheng, G and Wilmot, C G (2009) Louisiana Highway Construction Cost Trend after Hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(07), 594–600.

Hale, D R, Shrestha, P P, Gibson, G E and Migliaccio, G C (2009) Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Journal of Construction Engineering and Management, 135(07), 579–87.

Kanit, R, Gunduz, M and Ozkan, O (2009) Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects. Journal of Construction Engineering and Management, 135(07), 609–13.

Lin, P, Lee, W and Lee, M (2009) Exploring Problems and Undesired Effects in the Construction Development Process: The Case of a Small- to Medium-Sized Developer in Taiwan. Journal of Construction Engineering and Management, 135(07), 560–9.

Ling, F Y and Gui, Y (2009) Strengths, Weaknesses, Opportunities, and Threats: Case Study of Consulting Firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(07), 628–36.

Miller, L, Mannering, F and Abraham, D M (2009) Effectiveness of Speed Control Measures on Nighttime Construction and Maintenance Projects. Journal of Construction Engineering and Management, 135(07), 614–9.

Perkins, R A (2009) Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, 135(07), 588–93.

Wan, S K, Kumaraswamy, M M and Liu, D T (2009) Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects. Journal of Construction Engineering and Management, 135(07), 637–46.

Watkins, M, Mukherjee, A, Onder, N and Mattila, K (2009) Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(07), 657–67.

Yang, J and Yin, P (2009) Isolated Collapsed But-For Delay Analysis Methodology. Journal of Construction Engineering and Management, 135(07), 570–8.

Zhu, Y, Ahmad, I and Wang, L (2009) Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects. Journal of Construction Engineering and Management, 135(07), 601–8.

Zou, P X and Zhang, G (2009) Comparative Study on the Perception of Construction Safety Risks in China and Australia. Journal of Construction Engineering and Management, 135(07), 620–7.